Newly Launched - AI Presentation Maker

close
category-banner

Work Breakdown Structure Covering Project Installation Project Scoping To Meet Customers Needs

Rating:
90%

You must be logged in to download this presentation.

Favourites Favourites
Impress your
audience
100%
Editable
Save Hours
of Time

PowerPoint presentation slides

This slide shows the WBS Work breakdown structure of Project XYZ which covers project installation, logistics, media, closing and their sub parts. Present the topic in a bit more detail with this Work Breakdown Structure Covering Project Installation Project Scoping To Meet Customers Needs. Use it as a tool for discussion and navigation on Project Initiation, Delivery Schedule, Print Advertising. This template is free to edit as deemed fit for your organization. Therefore download it now.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Clement Patel

    Awesome use of colors and designs in product templates.
  2. 100%

    by Clifford Powell

    Out of the box and creative design.

2 Item(s)

per page: