Newly Launched - AI Presentation Maker

close
category-banner

Project Construction Work Breakdown Structure For Cost Management

Rating:
90%

You must be logged in to download this presentation.

Favourites Favourites
Impress your
audience
100%
Editable
Save Hours
of Time

PowerPoint presentation slides

This slide represents constriction project WBS. It includes completion status and budget for internal level, foundation level, external level, electrical, digging, plumbing etc. Introducing our premium set of slides with Project Construction Work Breakdown Structure For Cost Management. Elucidate the three stages and present information using this PPT slide. This is a completely adaptable PowerPoint template design that can be used to interpret topics like Internal, Electrical, Plumbing, Digging, Foundation. So download instantly and tailor it with your information.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review
Most Relevant Reviews

2 Item(s)

per page:
  1. 80%

    by Eddie Sandoval

    You can rely on SlideTeam whenever you run out of designs for your presentation. Thank you so much SlideTeam!
  2. 100%

    by Darryl Gordon

    Loved the fact that SlideTeam provides clean, high-definition, and professional PowerPoint products. 

2 Item(s)

per page: