Newly Launched - AI Presentation Maker

close
category-banner

Work breakdown structure for software upgradation

Rating:
87%

You must be logged in to download this presentation.

Favourites Favourites
Impress your
audience
100%
Editable
Save Hours
of Time

PowerPoint presentation slides

This slide shows the work breakdown structure for upgrading software which includes configuration, deployment, migration, performing core functionality testing, upgrade customisations with quick call, email to new customer, content migration, interfaces, etc Introducing our premium set of slides with Work Breakdown Structure For Software Upgradation. Elucidate the five stages and present information using this PPT slide. This is a completely adaptable PowerPoint template design that can be used to interpret topics like Infrastructure, Customisation, Analysing. So download instantly and tailor it with your information.

Ratings and Reviews

87% of 100
Write a review
Most Relevant Reviews

3 Item(s)

per page:
  1. 80%

    by Edward Nunez

    Presentation Design is very nice, good work with the content as well.
  2. 100%

    by Dannie Washington

    Best way of representation of the topic.
  3. 80%

    by Colin Barnes

    Top Quality presentations that are easily editable.

3 Item(s)

per page: